Panama Schedule Generator

Build a free 12-month Panama schedule—the rotating 2-2-3 12-hour shift calendar used by 24/7 plants, hospitals, security teams, and utilities. Pick your start date and starting day or night block, check biweekly hours and day/night flips, and export to ICS, CSV, or print.

Configure your Panama schedule

Presets
Rotation cadence
Select team & starting shift
Team A · 28-day Panama cycle (Weeks 1–4)
Shift hours, pay week & time zone
Jump to calendar preview

Team A · 28-Day Rotating

January 2027

Work shifts18291D · 91N
Total hours2,184 h
Biweekly split48h / 36h+8h OT/2wk
3-day weekends off2625 day↔night flips
  • Day shift
  • Night shift
  • Off
SunMonTueWedThuFriSat
Monday, January 4

Day shift · 07:00–19:00 · 12h

91 day · 91 night · 183 offJan 1, 2027 – Dec 31, 2027 · America/New_York · avg 41.9h/wk

Ready-to-use Panama schedule examples

Load a standard 12-hour Panama rotation into the calendar above to check day-to-night transition weekends, adjust PTO days, or export a full year to ICS or CSV.

4-Week (28-Day) Panama Schedule Chart & 4-Team Rotation

In a classic 28-day Panama schedule, every team works 14 twelve-hour shifts across four weeks—7 Day shifts in one two-week block and 7 Night shifts in the next—so all four crews share weekend and overnight coverage equally.

Panama schedule 4-week 28-day 2-2-3 12-hour shift rotation chart showing Teams A, B, C, and D flipping between Day shifts and Night shifts every two weeks
28-day Panama schedule rotation: Weeks 1–2 and Weeks 3–4 across Teams A–D, flipping between 12-hour Days and Nights after every second weekend.

Readable without JavaScript. Scroll horizontally on smaller screens to inspect each two-week block.

Weeks 1–2 (Days 1–14 · First Shift Block)

TeamMonTueWedThuFriSatSunMonTueWedThuFriSatSunBlock
Team ADays (Wk 1–2)7D · 84h
Team BDays (Wk 1–2)7D · 84h
Team CNights (Wk 1–2)7N · 84h
Team DNights (Wk 1–2)7N · 84h

Weeks 3–4 (Days 15–28 · Day ↔ Night Flip)

TeamMonTueWedThuFriSatSunMonTueWedThuFriSatSun28d Total
Team ANights (Wk 3–4)7D / 7N · 168h
Team BNights (Wk 3–4)7D / 7N · 168h
Team CDays (Wk 3–4)7D / 7N · 168h
Team DDays (Wk 3–4)7D / 7N · 168h

Already have a published plant or hospital shift roster?

Upload a PDF, screenshot, or wall-calendar photo that already includes holiday shutdowns, training days, or shift trades to convert every shift into one ICS file.

How the 2-2-3 12-hour Panama rotation works

A Panama shift schedule splits 24/7 operations across four teams (A, B, C, and D) working 12-hour shifts so no one ever works more than three days in a row and every team gets half of all weekends off:

  1. Weeks 1–2 (first shift block): Team A works Mon–Tue, rests Wed–Thu, works Fri–Sun (5 shifts), then rests Mon–Tue, works Wed–Thu, and gets Fri–Sun off (2 shifts). Team B covers the exact opposite days.
  2. 72-hour weekend turnaround: Because Week 2 ends with a 3-day Friday–Sunday break, Team A has three full days to reset its sleep clock before switching shifts.
  3. Weeks 3–4 (day ↔ night flip): Team A repeats the identical 2-2-3 days on Night shift while Team C rotates from Nights onto Days. After Day 28, the 4-week cycle repeats cleanly.

Panama schedule hours, extra days per year, and overtime math

Across each 28-day Panama cycle, every team works 14 twelve-hour shifts (168 hours)—an average of 42 hours per week. Over a full 365-day calendar year that equals 182 shifts (2,184 hours) or 183 shifts (2,196 hours) depending on where January 1 lands in the cycle (~2,190 hours on average, or roughly 9 extra 12-hour shifts per year above a standard 2,080-hour schedule):

  • Sun–Sat payroll week (36h / 48h): Alternates a 3-shift light week and a 4-shift heavy week, creating 8 overtime hours above 40 every two weeks (~208 built-in OT hours/year).
  • Mon–Sun payroll week (24h / 60h): Pushes 5 shifts into Week 1 and 2 shifts into Week 2, creating 20 overtime hours biweekly unless payroll splits the boundary shift.
  • Short-shift or 80-hour biweekly variant: Many plants convert one 12-hour shift per fortnight into an 8-hour shift (or schedule a midday pay-week split) to keep regular pay periods near 80–84 hours.

Managing the day-to-night flip: 2-week vs. 4-week cadence

Rotating between 12-hour days and nights is the defining feature of a Panama schedule. Choosing the right flip cadence determines how manageable the rotation feels over a full year:

  • 28-day Panama (~25–26 flips/year): Keeps overnight stretches short (only 7 night shifts per month), which helps families maintain daytime routines—at the cost of flipping sleep twice a month.
  • 56-day slow Panama (~12–13 flips/year): Groups 4 weeks of Days and 4 weeks of Nights so workers stay adapted longer and cut circadian transitions in half. Select 56-Day Slow Rotation in the generator above to preview both.
  • Zero-flip alternative: If your facility pays a night differential and lets crews bid for permanent shifts, use a fixed 2-2-3 pattern (Pitman schedule) instead of rotating.

Panama vs. Pitman vs. DuPont (and 4-on / 4-off)

Use this side-by-side comparison to confirm whether the 4-week Panama rotation or a sibling 24/7 shift pattern fits your crew (scroll horizontally on narrow screens):

Shift PatternCycle LengthMax ConsecutiveDay / Night RuleWeekends Off
Panama Schedule (2-2-3 Rotating)28 days (or 56 days)3 shiftsAll 4 teams rotate Days ↔ Nights every 2–4 weeksEvery other 3-day weekend (26/yr)
Pitman Schedule (Fixed 2-2-3)14 days3 shiftsFixed day crews (A/B) & fixed night crews (C/D)Every other 3-day weekend (26/yr)
DuPont Schedule28 days4 shiftsRotates 4N, 3D, 3N, 4D across a 4-week loopOne 7-day stretch off per month
4-on / 4-off Schedule8 days4 shiftsFixed or 2 days + 2 nights, then 4 offDrifts by 1 weekday each cycle

Need a custom pattern like 4-on/4-off or 2-2-4? Open the Shift Calendar Generator hub, compare fixed squads on our Pitman Schedule Calendar, or build 24/48 and 48/96 rosters on the Firefighter Shift Calendar.

How to import your Panama schedule into Google, Apple, or Outlook

Click Download ICS in the generator above to export a single calendar file for your entire year or custom range, then import it into a separate “Work Shifts” calendar:

Building a supervisor workbook? Download the CSV Template above or turn any ICS file into a formatted spreadsheet with our ICS to Excel Converter.

Panama schedule FAQ

Are the Panama schedule and the 2-2-3 shift schedule the same?

Yes. Both use the 2-2-3 12-hour shift cadence (2 days on, 2 off, 3 on in Week 1; 2 off, 2 on, 3 off in Week 2). “Panama schedule” is the widely used name when four crews rotate evenly between 12-hour day shifts and 12-hour night shifts on a repeating 4-week (28-day) or 8-week (56-day) cycle.

How is a Panama schedule different from a Pitman schedule?

They share the same 2-2-3 work/off skeleton, but a Panama schedule rotates crews between day and night shifts every 2 or 4 weeks so overnight duty is shared fairly. A Pitman schedule typically assigns permanent day squads and permanent night squads on a fixed 14-day loop.

How many hours per week and extra days per year do you work on a Panama schedule?

Each crew works 7 twelve-hour shifts every 14 days—84 hours biweekly, or 42 hours per week on average (alternating 36-hour and 48-hour Sun–Sat weeks). Over a 365-day year that equals 182 shifts (2,184 hours) or 183 shifts (2,196 hours) depending on where January 1 falls in the cycle—roughly 104–116 hours (about 9 extra 12-hour shifts) above a standard 2,080-hour work year.

Should crews flip between day and night shifts every 2 weeks or every 4 weeks?

In the standard 28-day Panama schedule, crews flip every 2 weeks: Teams A and C switch right after their 3-day Friday–Sunday weekend off (72–96 hours between shifts), while Teams B and D switch after their 2-day Monday–Tuesday break (giving Team D a tighter 48-hour night-to-day turnaround). Operations looking to reduce sleep disruption often choose the 56-day slow Panama rotation—4 weeks of days followed by 4 weeks of nights—which cuts annual flips in half.

How do I import my Panama schedule into Google Calendar or Apple Calendar?

Configure your start date, team, and starting shift block above, then click Download ICS. In Google Calendar on desktop, go to Settings → Import & export and upload the file into a dedicated “Work Shifts” calendar. On Mac use File → Import; on iPhone AirDrop or email the .ics file and tap Add All.

Does the ICS export handle overnight 12-hour shifts and Daylight Saving Time?

Yes. Overnight shifts such as 19:00–07:00 export as one continuous event finishing the next morning in your chosen work time zone. Local handover times stay aligned across spring-forward (11h elapsed) and fall-back (13h elapsed) clock changes.